翻訳と辞書
Words near each other
・ Green Mountain Marathon
・ Green Mountain National Forest
・ Green Mountain Orchestra
・ Green Mountain Race Track
・ Green Mountain Railroad
・ Green Line (Dallas Area Rapid Transit)
・ Green Line (Delhi Metro)
・ Green Line (Dubai Metro)
・ Green Line (Israel)
・ Green Line (Lebanon)
・ Green Line (Los Angeles Metro)
・ Green Line (Luas)
・ Green Line (MARTA)
・ Green Line (MBTA)
・ Green Line (Montreal Metro)
Green Line (Namma Metro)
・ Green Line (Sacramento RT)
・ Green Line (San Diego Trolley)
・ Green Line (Tel Aviv Light Rail)
・ Green Line (TRAX)
・ Green Line (Washington Metro)
・ Green Line (Yokohama)
・ Green Line bus route 724
・ Green Line Coach Station
・ Green Line Coaches
・ Green Line Express
・ Green Line Extension
・ Green Line Rivalry
・ Green Line route 757
・ Green Line route 797


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Green Line (Namma Metro) : ウィキペディア英語版
Green Line (Namma Metro)

The Green Line〔(【引用サイトリンク】title=Namma Metro Green Line )〕 of the Namma Metro is part of the mass-transit rail system for the city of Bangalore, India. It will consist of 24 stations from Nagasandra to Puttenahalli under Phase I. When Phase II is completed, it will stretch from BIEC in the north to Anjanapura in the south. The line will measure 24.20 km and will be mostly elevated, with some stations underground.〔(【引用サイトリンク】title=Bangalore Metro ready with Rs 500cr deal )〕 The line will connect the northern and the southern areas of Bangalore. The Phase I extension, from Nagasandra to Puttenahalli is expected to be over and commence operations by June 2016, thereby completing the entire Green Line and Phase I network, which has been plagued by delays and cost problems.〔(【引用サイトリンク】title=Bangalore )
==History==
The following dates represent the dates the section opened to the public, not the private inauguration.
The detailed project report (DPR) for Phase I, comprising the Purple and Green Lines, of Namma Metro project was prepared by the Delhi Metro Rail Corporation (DMRC) and submitted to the BMRCL in May 2003. The final approval on a scheme that incorporated the expertise of DMRC and RITES Limited did not come until April 2006. The DPR prepared by DMRC envisaged a elevated and underground rail network with 32 stations for Phase I of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution.
Construction work for Phase I of the Namma Metro project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006 the Indian Cabinet approved the project, which was then budgeted at more than . The cost escalated to as various problems delayed the completion. BMRCL received from Housing and Urban Development Corporation (HUDCO), from the Asian Development Bank (ADB), 23% from the Central Government, 33% from the State Government and the rest as a loan from the Japan International Cooperation Agency (JICA).〔(【引用サイトリンク】title=Namma Metro Phase II requires Rs. 25,000 crore – southindia – Hyderabad – ibnlive )
The foundation stone for the Phase I construction was laid by Prime Minister Manmohan Singh on 24 June 2006.〔(【引用サイトリンク】work=PM office website )〕 Construction on Reach 3 and 3A of Phase I of the Namma Metro began in 2009-10. The total cost of the project on this stretch was 2,100 crore. The underground work commenced in May 2011. Each corridor consists of two tunnels which are the first underground tunnels built for trains in South India. The tunnels, dug using tunnel boring machines (TBM), are located approximately 60 feet below ground level, have a diameter of 5.5metres and are 5metres apart. Four TBMs, nicknamed Helen (TBM 1), Margarita (TBM 2), Kaveri (TBM 3) and Krishna, were used for tunnelling work on the Green Line. A trial run was conducted on 8 August 2013.
Construction of the stretch required 1.3 lakh tonnes of concrete, 44,500 tonnes of steel bars, and 190 km of high tension wires weighing 2900 tonnes. A total of 395 piers, including station piers and portals, were constructed on the stretch. The tallest pier of the viaduct is a 21-metre pier between Kuvempu Road and Sriramapuram stations, opposite Gayatri Devi Park. There 353 spans on the stretch, the longest being the 66 metre curved span over the railway track off Sriramapuram. The total roofing area of the 10 stations on the stretch was 47,000 square metres.
The line was opened to the public on 1 March 2014. BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers travelled on the line on opening day. Civil works had not been completed at Peenya Industry and Peenya stations, among others. These were covered up by paintings, and work was expected to be complete in another two months. In the first month of operations, 7.62 lakh people at an average of 24,605 people daily used the line, generating a revenue of .
A 3.4 km stretch of the Green Line from Peenya Industry to Nagasandra was opened on 1 May 2015. Three new stations - Jalahalli, Dasarahalli and Nagasandra - were added to the line. Metro trains cover the 10.5 km stretch from Sampige Road to Nagasandra in 25 minutes. The line was inaugurated by Chief Minister Siddaramaiah and Union Urban Development Minister Venkaiah Naidu at Peenya depot. Protestors holding placards and shouting slogans gathered at the venue during the inauguration and protested BMRCL's decision to not provide toilets or drinking water facilities at all stations. By the end of June 2015, the extension increased daily ridership on the line by 6000 passengers for a total of 25,000-30,000 passengers per day, overtaking the Purple Line which had a daily ridership of 20,000-25,000. Prior to the extension, the Purple Line had been the busiest line on the metro.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Green Line (Namma Metro)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.